With the project proposal "Reconstruction and rehabilitation of a part of the street network in the village of Vladimirovo, Lehchevo and Madan village, Boychinovtsi municipality" is envisaged to improve the transport and exploitation qualities of the pavements on five streets in three settlements in Boychinovtsi municipality, namely: - Hristo Mihailov Str. 0 + 000 to km. 0 + 750 - Vladimirovo village, Boychinovtsi municipality, Montana district - 750 m .; - "Hristo Smirnenski" Str. 0 + 000 to km. 0 + 360 - Madan village, Boychinovtsi municipality, Montana district - 360 m .; - Stefan Karadzha Str. 0 + 000 to km. 0 + 420 - village of Lehchevo, Boychinovtsi municipality, Montana district - 420 m .; - Ivan Vazov Str. 0 + 000 to km. 0 + 145 - village of Lehchevo, Boychinovtsi municipality, Montana district - 145 m .; - Rayko Daskalov Str. 0 + 000 to km. 0 + 189 - village of Lehchevo, Boychinovtsi municipality, Montana district - 189 m. The total length of the streets envisaged for reconstruction and rehabilitation is 1,864 meters. The project proposal includes preliminary repairs - destroying the existing asphalt pavement and crushing the stone to reach the existing levels. To reach a design gauge of 6.00 m, a new road construction is planned - road crushed stone base with a thickness of 45 cm and different width. The required widths to achieve a design gauge are presented on the relevant cross sectional profiles. The design solution envisages the deterioration of the existing curbs and the construction of new concrete curbs with dimensions 18/35 cm on a concrete base, with a reduction of the curb line according to the attached road details in front of the yard and garage entrances.
Overview
Status | Contracted |
---|---|
Start date | 07 May, 2019 |
End date | 07 May, 2022 |
Contract date | 07 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 1,085,586.25 |
---|---|
Grant | 1,085,586.25 |
Self finance | 0.00 |
Total paid | 542,793.11 |
EU participation percent | 85.0% |
Location