The project includes repair works on two streets in the town of Aksakovo: Ilia Dimitrov Str. and Zdravets Str. with a total length of 1 474m. It is foreseen: replacement of damped pavement, new restricting visible curbs, new asphalt pavement on part of the streets, replacement of existing street lights with new energy saving ones, new horizontal markings and additional vertical signaling. The project complies with the requirements for accessibility by providing ramps for the disabled to the level of the flooring. Construction of concrete ramps is planned in front of existing garage entrances.
Overview
Status | Contracted |
---|---|
Start date | 05 Jun, 2019 |
End date | 05 Jun, 2022 |
Contract date | 05 Jun, 2019 |
Programme
Beneficiary
Financial information
Total cost | 1,098,316.86 |
---|---|
Grant | 1,098,316.86 |
Self finance | 0.00 |
Total paid | 549,000.00 |
EU participation percent | 85.0% |