"Reconstruction and rehabilitation of existing streets and pavement in the town of Momchilgrad".

In the project are included the following subtitles: 1) Subtitle 1: San Stefano street with the length of 1+338,70 m; 2) Subtitle 2: Hadji Dimitar street with the length of 0+597,76 m; 3) Subtitle 3: Giumiurdjinska street with the length of 1+188,19 m. The location of subtitle one is in the north part of the town, right next to Makaza street. San Stefano street connects the main Makaza street, which is a part of the republican road II-59, with the road to "Momchil uinak" hut and has the function of a collectible point for 11 neighborhood. Subtitle two is an alternative route for connection of 11 neighborhood with the main Makaza street, which is a part of the republic road network. Subtitle three is a main transport artery for the town. It begins and ends with a crossroad on Makaza street (road II-59) as it passes through the central town part and its route is almost parallel of the republican road. The project foresees preservation of the existing gauge of the road lane. A repair of all pedestrian areas is foresaw, and this includes removal of the existing grounds, shaping of an alignment and preparing of the basis and laying of new concrete pavement slabs and new concrete urban curbs around the green areas. All of the street curbs will be replaced with new concrete curbs. Local repairs in the problem zones are foresaw, a cleaning of the coverage, a making of a bitumen spill for a good connection of the layers and an implementation of a whole new wear layer of thick asphalt concrete. The diversion of the rain water will be kept to the rainwater drains. It wont be repaired.

Comments
Leave a comment

Overview

Status Contracted
Start date 29 May, 2019
End date 29 May, 2022
Contract date 29 May, 2019
View in UMIS

Financial information

Total cost 1,143,136.12
Grant 1,143,136.12
Self finance 0.00
Total paid 571,568.03
EU participation percent 85.0%

Location