With a project proposal "Development of a street network in the village of Rasovo and the village of Medkovets, Medkovets municipality will be reconstructed one street in the village of Medkovets and seven streets in the village of Rasovo, Medkovets municipality,namely: Development of a street network in the village of Medkovets: - Dunav Street from 158 to 305-Medkovets village with a length of 428.60 m. The street is located in the regulation of the village of Medkovets According to its functional purpose the street is from the secondary street network of the village of Medkovets Development of a street network in the village of Rasovo: - Aheloy Street from 52 to 69 km-with a length of 210 m - Vela Peeva Street-from 88 to 90 km-with a length of 222 m - Kiril i Metodiy St.-from 143 (intersection with WP-III 8105) to OT 145 (intersection with WP-III 8105)-with a length of 351 m - Todor Pavlov Street - from 43 to 90 km-with a length of 512 m - Ilarion Makariopolski str. from 6 to 67 km-with a length of 161.15 m - Dimitar Blagoev Street - from 169 to 163a-with a length of 364.05 m. - Alexander Makedonski Str. and Ivan Vazov St.-from 200 (junction with road MON 1132) to 103 km-with a length of 959.60 m All streets are located in the village of Rasovo. According to their functional purpose, the above-mentioned streets are from the secondary street network of the village of Rasovo The total length of the street network to be reconstructed is 3,208.40 m According to their functional purpose, the above-mentioned streets are from the secondary street network of Rasovo and Medkovets. With the project proposal, the street flooring will be reconstructed to stop the demolition process and to ensure the load-bearing capacity, the flatness and drainage of the surface water. Drainage of the street is carried out with appropriate longitudinal and transverse slopes and at certain locations with street runoff that are discharged into the existing drainage/drainage network
Overview
Status | Contracted |
---|---|
Start date | 10 May, 2019 |
End date | 10 May, 2022 |
Contract date | 10 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 1,107,263.24 |
---|---|
Grant | 1,107,263.24 |
Self finance | 0.00 |
Total paid | 541,132.12 |
EU participation percent | 85.0% |
Location