Reconstruction and rehabilitation of streets and sidewalks in the municipality. Ruzhintsi, reg. Vidin

The project proposal includes reconstruction and rehabilitation of 10 sections as follows:5 (sections 1,2,3,4 and 9) in the village of Drenovets,2(sections 5 and 6)in the village of Rujintsi,section 7 in the village of Belo pole, section 8 in the village of Topolovets,section 10 in the village of Gugrich.The streets are from the secondary street network. Section 1 in the village of Drenovets starts at a junction at km 0+000.00 and ends at the "T"intersection with the road III-114 at km 0+624.88,with the length of the section 624.88m. Section 2 in the village of Drenovets starts at a junction at km 0+000.00 and ends at the "T" junction with the road III-114 at km 0+237.92,with the length of the section 237.92m. Section 3 in the village of Drenovets starts at a junction with a road III-114 at km 0+000.00 and ends at a junction with road III-114 at km 0+358.00 with a section length of 358.00m. Section 4 in the village of Drenovets starts at a junction with a road III-114 at km 0+000.00 and ends at a junction with section 9 at km 0+339.90 with a length of 339.90m Section 9 in the village of Drenovets begins at a junction with a section 4 at km 0+000.00 and ends at km 0+098.60 with a section length of 98.60m. Section 6 in the village of Rujintsi starts at a junction with a road III-114 at km 0+000.00 and ends at km 0+527.44,with the length of the section-527.44m The length of segment 5 is 527.44 m Section 5 in the village of Rujintsi has a length of 299.28m Section 7 in the village of Belo pole starts at a junction with a municipal road at km 0+000.00 and ends at km 0+256.99 on the same road,with the length of the section 256.99m Section 8 in the village of Topolovets starts at a junction with a road III-114 at km 0+000.00 and ends at a junction with a road III-112 at km 0+240.00,with a section length of 240.00m. Section 10 in the village of Gurgich begins at a junction with the IV-2162 road at km 0+000.00 and ends at km 0+50.08,with a section length of 50.08m

Comments
Leave a comment

Overview

Status Contracted
Start date 08 May, 2019
End date 08 May, 2022
Contract date 08 May, 2019
View in UMIS

Financial information

Total cost 1,173,302.18
Grant 1,173,302.18
Self finance 0.00
Total paid 583,153.87
EU participation percent 85.0%

Location