Development of Tryavna municipality through improvement of technical infrastructure

The project proposal envisages the reconstruction and rehabilitation of two streets with heavy traffic, which are heavily depreciated in the territory of the town of Tryavna - "Lyaskov Dyal" Street and "Ukraina" Street. "Lyaskov Dyal" Street connects two busy neighborhoods of the city and provides quick transport access to emergency services in Tryavna and the municipal hospital. Street "Ukraina" is the backbone of another neighborhood of the city and provides connection with the third-class road connecting Tryavna with the Pass of the Republic. The project proposal is for reconstruction of "Ukraina" street with which to enhance it‘s technical and operational status, load-bearing capacity, durability and smoothness of the asphalt pavement. For this purpose, the existing asphalt pavement, the crushed stone foundation and the concrete curbs on the street are planned to be removed. We will make new layers of crushed stone and bituminous crushed stone and concrete curbs. There will also be two layers of asphalt concrete - Hollow and dense. The project also includes the reconstruction of adjacent sidewalks. Street "Ukraina" is 1542.5 meters long, but the subject of the reconstruction will be only the first 790 meters of it. The street canvas is 6666 square meters and the sidewalks - 3350 sq. m. The rehabilitation of Lyaskov Dyal Street will be done by replacing the existing paving floor with two-layer asphalt pavement. Here too, the bearing layer will be removed and new layers of crushed stone and bituminous crushed stone will be laid, as well as concrete curbs. Will make two layers of asphalt - Hollow and dense. It is planned to repair the existing sidewalks by replacing the curbs and the pavement. the rehabilitation is 808,80 m long. The street canvas is 4740 square meters and the sidewalks - 1390 sq. m.

Comments
Leave a comment

Overview

Status Contracted
Start date 15 May, 2019
End date 15 May, 2022
Contract date 15 May, 2019
View in UMIS

Financial information

Total cost 1,117,768.89
Grant 1,117,768.89
Self finance 0.00
Total paid 462,981.69
EU participation percent 85.0%

Location