Rehabilitation of nine stretches of streets in eight populated places of the municipality is envisaged. The condition of the pavement on these streets is bad. Road roughness is a feature of road surface performance and has a significant impact on the safety and comfort of travelers, the dynamic load of the pavement and the cost of road transport. In the investigation, it was found that much of the existing pavement was compromised. The surface is deformed and severely eroded, with linear shrinkages in places and with many variable transverse slopes. There are superficial cracked areas.
Overview
Status | Contracted |
---|---|
Start date | 13 May, 2019 |
End date | 13 May, 2022 |
Contract date | 13 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 1,170,999.77 |
---|---|
Grant | 1,170,999.77 |
Self finance | 0.00 |
Total paid | 585,577.92 |
EU participation percent | 85.0% |
Location