"Reconstruction of a street network in the town of Chiprovtsi, village of Prevala, village of Beli mel and Martinovo village, Chiprovtsi municipality"

With a project proposal "Reconstruction of a street network in Chiprovtsi, Prevala village, Belimel and Martinovo villages, Chiprovtsi municipality" is envisaged to improve the transport and exploitation qualities of the 5 streets in four settlements in the municipality of Chiprovtsi , namely: 1. "Prof. T. Andreev", Chiprovci, - The proposed for reconstruction street provides direct connection to the town of Chiprovtsi with higher class roads, namely - NR III - 1022, lenght 168,70 m. 2."STEFAN DUNYOV", Chiprovci - lenght 258,39 m. 3. "Petar Kalafatov" in the village of Prevala OK 11 Ok 173 - The proposed for reconstruction street provides direct connection of Prevala village with higher class roads - NR ІІІ - 102, lenght 1045,70m. 4. DEVETA, in Martinovo, from OK 39, OK 40, OK 41 to OK 42 - The proposed for reconstruction street provides direct connection to the village of Martinovo with higher class roads, namely NR III - 1022 , lenght 110 m. 5. TRETA, in Belimel, from OK 151, OK 166, OK 167, OK 168, OK 169 to OK 60 - The proposed street for reconstruction provides direct connection to the Beli Mel village with higher class roads , namely - NR III - 1022, lenght 180 m. The total length of the streets envisaged for reconstruction and rehabilitation is 1,762.79 meters. The project proposal envisages the deterioration of the existing asphalt pavement and the laying of crushed stone to reach the existing levels. To reach the design gauge is envisaged the construction of a new road construction - road base of crushed stone and other, and different width. The required widths to achieve a design gauge are presented on the relevant cross sectional profiles. The design solution provides for the deterioration of existing curbs and the construction of new concrete curbs on a concrete foundation, with a reduction in the curb along the entrances for courtyards and garages according to the attached track details. The sidewalks of the streets are also being updated.

Comments
Leave a comment

Overview

Status Contracted
Start date 11 Sep, 2020
End date 11 Sep, 2023
Contract date 11 Sep, 2020
View in UMIS

Financial information

Total cost 654,746.18
Grant 654,746.18
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%