The project of the Municipality of Sapareva Banya, which envisages the reconstruction and repair of the street network, the sidewalks, the reflections and the accessories, will be implemented on the territory of Sapareva Banya with ECATETE 65365, Sapareva Banya Municipality. The project covers three sub-projects: Slavyani Str., Lipa Str. And "Gyuritsa" Str. The main objective of this project is to build, restore and improve the transport performance and the load-bearing capacity of the roadway pavement in order to provide conditions for traffic safety, passenger comfort and good drainage of streets of surrounding areas, replacement and lifting existing curbs, restoration and construction of new sidewalks and pavements, providing an accessible environment in the areas under consideration. The project envisages the removal of the existing road construction and flooring and the laying of a new one, at the beginning and at the end of the sections, in order to connect the new with the old road construction, a milling of the flooring is achieved. It is envisaged to apply curbs to the places where their integrity is disturbed, to reduce the curbs in the zones of the intersections, according to the requirements for building of a generally accessible environment, lifting of all street and rainwater shafts (drainage), pavement, reconstruction and construction of new pavements .
Overview
Status | Contracted |
---|---|
Start date | 23 May, 2019 |
End date | 23 May, 2022 |
Contract date | 23 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 1,017,381.00 |
---|---|
Grant | 1,017,381.00 |
Self finance | 0.00 |
Total paid | 19,530.10 |
EU participation percent | 85.0% |
Location