"Reconstruction and rehabilitation of streets in settlements of Venets municipality"

The present project proposal envisages the reconstruction of 8 streets in 4 settlements in Venets municipality, namely: reconstruction and rehabilitation of "Dubrava" Str., "Dubrava" Str. - section 1 (west) and "Svoboda" Str. In Borci ; Han Krum Street in the village of Izgrev; Stara Planina str. and "Dunav" str. in the village of Venets, "Yavor" str. and "Izvorna" street in the village of Yasenkovo. The total length of the planned streets for reconstruction and rehabilitation is 3546.56m. an EU citizen must have the opportunity to live and move safely and safely in the area where he lives,whether it be a city or a village. The on-board or vehicular movement must be done with minimal risk to the people. Through the implementation of the project proposal,achieve the improvement of the transport-performance characteristics of the reconstruction and rehabilitation streets will reduce the dustiness of the transport of vehicles on them,which in turn will lead to a deterioration of the health of the residents in the villages of Bortsi,Izgrev, Venets and Yasenkovo, Venets municipality and will reduce the danger of road- traffic accidents resulting from poor condition of the pavements, causing technical damage to cars and loss of control over their management. Improved street infrastructure will provide comfort,comfort and fast and in the movement of residents in the respective towns mesta. Podobryavaneto access is essential for economic growth and diversification in rural areas,including the development of their tourism potential. The implementation of the planned investments will boost the local economies and will keep the young and enterprising people in the Venets municipality. The target groups targeted by the project are people from diverse social,age,ethnic groups, Mobility or population of 4109 people living in villages Borci,Izgrev,Venets and Yessenkovo,which represents 58% of the population of the municipality and who will benefit from the results of this project.

Comments
Leave a comment

Overview

Status Contracted
Start date 16 May, 2019
End date 16 May, 2022
Contract date 16 May, 2019
View in UMIS

Financial information

Total cost 1,159,964.83
Grant 1,159,964.83
Self finance 0.00
Total paid 577,174.29
EU participation percent 85.0%

Location