“Reconstruction and rehabilitation of existing streets and paths, installations and accessories to them on the territory of Botevgrad Municipality”

The aim of the project “Reconstruction and rehabilitation of existing streets and paths, installations and accessories to them on the territory of Botevgrad Municipality” is to improve the quality of life in the Municipality of Botevgrad, through repairs and reconstruction of the street network of 4 settlements in the municipality. The project includes reconstruction and repair of streets: “Vitinya” str. and “P.R.Slaveykov” str. in v. Vrachesh, "Stubelska” str. in v.Trudovets, “Hristo Botev” str. in v.Skravena, “Bogovina” str. and “6th of September” str. in v.Litakovo.Through the implementation of the project will be provided direct transport connections to a population of 9916 people(3296-v.Vrachesh, 3076-v.Trudovets,1709-v.Skravena and 1835-v.Litakovo) with the Republican Road Infrastructure.Through the reconstruction and repair of "Vitinya"srt. in v.Vrachesh will be provided direct transport connection to the population and the guests with the Republican road I-1,which is a first-class road from the Road network of Bulgaria.The street provides transport connections for tourists from the main road I-1 to Vrachesh Monastery, a tourist site of regional importance for the tourism in the Botevgrad region.The reconstruction and repair of “Stubelska”str. will provide direct transport connections for the population and guests of v.Trudovets with the Republican road I-3(Sofia-Rousse).The reconstruction of "Hristo Botev"str. in v.Skravena will ensure direct transport connection for the population and guests at E79 Vidin-Mezdra-Botevgrad-Blagoevgrad-Kulata, which coincides with the route of pan-European transport corridor №4.Through the reconstruction of "Bogovina"str. in v.Litakovo will be provided direct transport connections for the population and the guests of the village with the third-class Republican Road III-161.The project will implement construction supervision, author's supervision,information and publicity and consultancy services related to project management.

Comments
Leave a comment

Overview

Status Contracted
Start date 19 Nov, 2021
End date 15 Sep, 2023
Contract date 19 Nov, 2021
View in UMIS

Financial information

Total cost 1,161,971.84
Grant 1,161,971.84
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location

Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia (BG412), Botevgrad, Botevgrad