Execution of construction and assembly works for reconstruction, repair, equipment and furnishing of SU" Vasil Levski "- Ardino, Ardino Municipality, including all accompanying costs, including: costs of preparation and management of the project, design costs, construction supervision, author's supervision. Construction and installation works include the following main activities: - replacement of the pavement in front of the central entrance of the building; - reprocessing of the yard; - Replacement of the deck of the decks on the pedestrian alleys; - removal of concrete unusable staircases, finger filling and pavement laying; - placing new garden benches in the recreation areas; - placement of elements for accessible environment - staircases; - Laying of rock wool insulation on a roof slab; - rearrangement of roof tiles and revision of gutters; - the existing tree-shrub sparrows are preserved, with the green areas being renewed with new grits with a suitable grass mixture; -interior refreshment of the rooms - repainting and replacement of the flooring; - Facade repainting with color phasogen; - A complete replacement of the electrical installation is planned; - Replace old boilers with new ones; - Reconstruction of the sewerage system for drainage of the terrain.
Overview
Status | Contracted |
---|---|
Start date | 08 May, 2019 |
End date | 08 May, 2022 |
Contract date | 08 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 935,814.47 |
---|---|
Grant | 935,814.47 |
Self finance | 0.00 |
Total paid | 464,319.15 |
EU participation percent | 85.0% |
Location