The project proposal provides for reconstruction, repair, equipment and furnishing of the St. Kliment Ohridski High School in Simeonovgrad. The subject of this project is the St. Kliment Ohridski Secondary School in Simeonovgrad. The building is located in the 61st floor, UPI I for school, transformer station and «Banner of Peace». The building of the St. Kliment Ohridski University of Sofia is L-shaped and consists of five parts - an old part (old corpus) built in 1966, and new parts - built before 1996, with usable basements. The old hull is located parallel to Hristo Botev Street, and the new ones are developed perpendicularly. The main entrance is located to the north, from "Hristo Botev" Str. The project proposal is a TA project for introducing energy efficiency measures for the reconstruction and reconstruction of the building without disturbing its construction. For the normal functioning of the building and the activities for which it has been designed, the parts have been developed: Architecture, Civil Engineering, Geodesy, Electricity, HVAC, EE, Water Supply and Sewerage, Water Supply and Sewerage, Water Supply and Sewerage..
Overview
Status | Contracted |
---|---|
Start date | 16 Mar, 2020 |
End date | 16 Mar, 2023 |
Contract date | 16 Mar, 2020 |
Programme
Beneficiary
Financial information
Total cost | 923,508.39 |
---|---|
Grant | 923,508.39 |
Self finance | 0.00 |
Total paid | 455,213.32 |
EU participation percent | 85.0% |
Location