The Object High School ST. CYRILL AND METHODS The town of Sredets, subject of the investment project, is part of a campus situated south of the high part of the settlement. The school is the only school in the city and prepares students from primary, primary and secondary education. The building complex is a type of implementation of this kind of infrastructure. Changes beyond the standard execution are imposed by the location and consequence in the course of operation. There are no changes in the functional scheme. Over the years, partial improvements have been made to the building, mainly to prevent leaks through the waterproofing of flat roofs, change of energy efficiency joinery and other minor repairs. The school complex as a whole needs renovation and improvements in a wide front - flat roofs, facades, joinery, sanitary facilities, study rooms, gymnasium, etc. There are prescriptions from RZI for adapting the quality of the habitat. Interventions are required to remove moisture from leaks, thermal bridges, lack of ventilation, etc. Change of waterproofing and heat insulation. Mold treatment. Replacement of broken floors, linings, joinery, etc.
Overview
Status | Contracted |
---|---|
Start date | 09 May, 2019 |
End date | 09 May, 2022 |
Contract date | 09 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 929,036.88 |
---|---|
Grant | 929,036.88 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location