The project envisages construction, installation and repair work in the building of "Zornitsa" Kinder garden and introduction of measures for improving the energy efficiency: - Roof works: Replacement of the non-bearing roof structure: cladding, facing boards, insulating polyethylene coating / roofing foil /, tiles and drainage system, making of a revision hole, applying the thermal insulation of the under roof space - on the floor and building a lightning protection with a pre-action; - Replacing door frames with new PVCs according to the working design; - Facade works: Reinforcement and plastering of compromised exterior plaster, laying of ESP thermal insulation systems on the facade walls and application of mineral plaster; - Repair of internal water and sewerage installation including replacement of toilets and kitchen sinks and toilets; - Repair of internal premises: replacement of floorings with new / granite tiles, terracotta, laminate /, replacement of tiles / faience /, preparation of walls and ceilings and refreshment with latex mixtures; - Vertical planning: dismantling of compromised outdoor pavements, preparing bases for new pavements, making a new sandstone; - Repairing an existing fence. The scope of the project is reduced to the following main components: Component 1. Construction installation work of "Zornitsa" Kinder garden =575,60 m2 Component 2.Deliveries of furnishing and equipment, and outdoor and outdoor facilities
Overview
Status | Contracted |
---|---|
Start date | 31 Aug, 2020 |
End date | 31 Aug, 2023 |
Contract date | 31 Aug, 2020 |
Programme
Beneficiary
Financial information
Total cost | 537,606.48 |
---|---|
Grant | 537,606.48 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location