The project proposal concerns the improvement of the energy efficiency of the educational infrastructure in the Municipality of Devnya - Devnya, the buildings of Kindergarten "Detelina" and Kindergarten "Nezabravka". The building of the Detelina Kindergarten consists of three blocks - A, B and C, connected architecturally and functionally to each other. Block A is a two-storey building with two entrances, in which are located the following premises - a study room, two bedrooms, a dining room, a toilet and a sanitary unit. Block B is a two-storey and one-story building. In the two-storey part are located premises as in block A and the one-storey is a kitchen block. Block V is a two-storey building, including the following rooms: a study room, a bedroom, a dining room, a spillway, a insulator, a logoped, a boiler room, a fuel store, staff and sanitary facilities. The building of Kindergarten Nezabravka consists of four parts - three two-storey and one-storey building. The one-storey building comprises the following premises - a directorate, a teacher's room, a room for the host, a warehouse, a doctor's office and a bathroom. The two-storey buildings include a study room, a bathroom, a storeroom, a lavatory and a living room, and the third two-storey building is designed for boiler and laundry. The project proposal aims at introducing energy efficiency measures to ensure adequate and cost-effective municipal educational infrastructure.
Overview
Status | Contracted |
---|---|
Start date | 13 May, 2019 |
End date | 13 May, 2022 |
Contract date | 13 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 915,075.41 |
---|---|
Grant | 915,075.41 |
Self finance | 0.00 |
Total paid | 476,871.62 |
EU participation percent | 85.0% |
Location