"Reconstruction, repair and development of kindergarten" Faith, Nadezhda and Love "in the village of Gorna Malina, Gorna Malina Municipality"

The project covers the repair of the kindergarten "Faith, Hope and Love" (with a total built-up area of 1685 sq.m.) and the yard space (with an area of 10 000 sq.m.), incl. building new playgrounds for children of different age groups. The present project envisages the replacement of indoor flooring in gaming halls and sanitary facilities, as well as repainting of the study rooms and dormitory rooms. In the repair of the yard will provide for the construction of new playgrounds for play and replacement of existing outdoor pavements. In general, the equipment in kindergarten is obsolete and does not meet the current regulations. In the present work, all existing non-useable equipment is dismantled. The new play areas are planned to be divided into playgrounds for children up to 3 years of age - 2, and playgrounds for children over 3 years of age. All new facilities are installed on a new shock-absorbing floor. One of the facilities is built on a grass massif - a climbing, hanging, equalizing facility, etc. In the area around the children's playgrounds are provided children's arbors - 4 pieces, and children's playhouses type "houses" with thematic games. In the courtyard of the kindergarten there are designed areas for training and sports - there is a rigid playground for free games and a territory for training on safety of the movement with equipment of the necessary markings and signs, as well as a bicycle. All sites will be equipped with waste bins - single, metal; benches - wood and metal with backrests; shock-absorbing flooring. In the area around the entrance / exit of the groups is also provided park equipment. The reconstruction of the surrounding area provides for restoration of the grass massif in the areas that are missing after the completion of the construction works. All existing floorings and curbs are set to be completely renovated.

Comments
Leave a comment

Overview

Status Contracted
Start date 14 May, 2019
End date 14 May, 2022
Contract date 14 May, 2019
View in UMIS

Financial information

Total cost 920,788.14
Grant 920,788.14
Self finance 0.00
Total paid 4,222.98
EU participation percent 85.0%

Location