Construction of indoor sports infrastructure, including equipment and furniture at St. Paisii Hilendarski High School, Petrich Municipality

The building is designed in the northern part of property I-534, which is intended for school. It is linked to the school building by a warm connection and an existing entrance to toilets and changing rooms for children. The terrain is currently a basketball court with asphalt pavement. The entrance to the gym is from the warm connection, and through three double-winged doors there is a passing around the building, which is present. Walking traffic is provided on all sides. The elevation of the gym is 20 centimeters above the current elevation. The projected displacement of 20 cm. is overcome with two steps and ramp for accessible environment, respectively, to both exterior doors. The building has a clear rectangular planning scheme with axes over 5.5m. and a support distance of 20m. The dimensions of the building are 33,30 / 20,20m and the built-up area is 670m2. The implementation of the project will improve the overall living standard of the population, will support the development of children, adolescents and young people, and will create a living environment that is adequate for the conditions of dynamism and competitiveness to express the creative potential of adolescents. This will help to achieve the objective of the specific procedure, namely to promote social inclusion, poverty reduction, and economic development in rural areas.

Comments
Leave a comment

Overview

Status Contracted
Start date 08 May, 2019
End date 08 May, 2022
Contract date 08 May, 2019
View in UMIS

Financial information

Total cost 487,174.96
Grant 487,174.96
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location