"Construction of a gymnasium on the territory of the secondary school" St. St. Kiril i Metodiy ", with headquarters: PI 179, district 11 according to the plan of the village of Krupnik, Simitli municipality"

The project proposal will be implemented on the territory of the only school in the village of Krupnik, Simitli municipality The investment project "Construction of a gymnasium on the territory of the secondary school" St. St. Kiril i Metodiy ", with location: PI 179, district 11 according to the plan of the village of Krupnik, Simitli ", provides for the construction of a training sports hall on one level with adjoining servicing premises, total area 578, 84 sq.m. The premises that will be available to the building are: a sports hall, a sports hall, a sanitary unit for visitors and students, two dressing rooms The sports hall has a bright size of 2370 cm / 1765 cm and a height of 820 cm, where sports and volleyball and basketball athletic events can be held. It is planned to deploy mobile stands with a capacity of about 140 seats. The illumination of the premises in the building will be natural - through façade openings, and artificial - by artificial lighting by design. To maintain a favorable microclimate, a local ventilation installation is envisaged. The roof is flat with internal drainage and thermal insulation layer. The school, on the territory of which the gym will be built, is the only one for the village of Krupnik and the adjacent settlements - Polena, Cherniche, Poleto village, Brezhani village and Rakitna village. In it, during the school year 2017/2018, 552 children were taught, aged from 6 to 18 years, respectively from 1-st grade to 12-th grade, and the newly built gymnasium will be used by all of them. Therefore, the target groups targeted by the project can be identified as follows: ▪ Residents of villages whose educational needs are covered by the St. Cyril and St. Methodius University - Krupnik, Brezhani, Polena, Poleto, Rakitna, Cherniche - 5116 people; ▪ Students attending the school on the territory of which the project will be implemented - 552 children. ▪ The inhabitants of Simitli municipality - 13 642 people.

Comments
Leave a comment

Overview

Status Contracted
Start date 16 May, 2019
End date 16 May, 2022
Contract date 16 May, 2019
View in UMIS

Financial information

Total cost 487,935.30
Grant 487,935.30
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%