In essence, the project envisages building a gymnasium at an existing school. The existing school is a three-story massive building. In the yard there is a separate area for sports activities, but they are not sufficient and meet the requirements for modern training and development of the students' physical culture. The school does not have a special gym for indoor and outdoor sports, which requires the construction of a new building for a gym with the attendant service rooms, which will provide a base for complete physical and sports activities during the cold months and provide with the services of the open sports grounds. The newly-built building of the gym is located within the boundary lines of the building on the sketch with a design visa. It is located east of the existing school and is in a warm connection with it. The building is sized for the simultaneous use of two classes or a total of about 72 students. Bright area of the hall, as possible field of play in the size of a clean rectangle is 29.80 meters at 18.00 meters. A functional height of 7.50 meters is provided. They are provided for mounting observation benches and space niches for recreation. The building will be built, air-conditioned and illuminated according to the applicable regulations.
Overview
Status | Contracted |
---|---|
Start date | 08 May, 2019 |
End date | 08 May, 2022 |
Contract date | 08 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 482,898.60 |
---|---|
Grant | 482,898.60 |
Self finance | 0.00 |
Total paid | 241,238.79 |
EU participation percent | 85.0% |
Location