The project of Nikopol municipality envisages the complete reconstruction and renovation of the Central Square, located in UPI I - 19, 1128, 1205, 1171 in 24 quarter in the town of Nikopol. The activities envisaged include: Renovating the square space to take into account the peculiarities of the terrain and adjacent spaces and to provide an environment accessible to everyone. Replacement of pavements is planned (where necessary), grouping fountains; building a main park element with stepped structure and mini amphitheater seating, with artistic lighting; four types of lighting - basic, regional, directional and artistic lighting. Different architectural elements, such as pots, benches, garbage bins, information boards placed in such a way as not to hinder the free passage of users with disabilities, are required. The project envisages the implementation of all necessary measures to ensure an accessible environment, according to Ordinance No. 6 of 2003. to build an accessible environment and urbanized areas - appropriate gauge of the alleys, strips with tactile plates, clear orientation for safe zones and eventual evacuation of people in case of disaster. After completion of the vertical planning and cleaning activities from the building materials, the green areas will be treated and re-buried. The existing vegetation will be enriched with shrub groups and color accents. Large-scale plants - decorative evergreen, deciduous and beautifully flowering trees, shrubs, etc., will be used, taking into account the infrastructural features of the terrain.
Overview
Status | Contracted |
---|---|
Start date | 21 May, 2019 |
End date | 21 May, 2022 |
Contract date | 21 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 632,288.44 |
---|---|
Grant | 632,288.44 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location