The project envisages the construction of a mini football pitch. The sports facility has an orthogonal plan structure with an axle contour on the 20.00 / 40.00m pillar base, which limits the artificial lawn. The playing field is 35,00 / 17,00 m. There are two 300/100/200 cm football gates in the middle on its short sides. On the site outside the playing field are provided service and search fields, where there will be seats on both sides of the entrance. The pavement is provided with artificial grass and pavement of concrete slabs for the alleys to reach the course. The course will be surrounded by a PVC mesh network up to a height of 2.50 m and a textile network up to 5.30 m high. The course is designed with two free-width inputs / outputs of 1.60 m, to allow for free passage.
Overview
Status | Contracted |
---|---|
Start date | 08 May, 2019 |
End date | 08 May, 2022 |
Contract date | 08 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 97,022.12 |
---|---|
Grant | 97,022.12 |
Self finance | 0.00 |
Total paid | 88,648.50 |
EU participation percent | 85.0% |
Location