The project of the Municipality of Lyubimets for "Construction of a sports playground, landscaping and development of UPI 31 for a playground and playground, 130a, according to the plan of the town of Lyubimets", will be realized in a regulated landed property, assigned to a sports playground and children's playground. The project envisages the construction combined football field for small loopholes and basketball with a size of 12x18 m. The playground will be covered with an asphalt pavement, protected with a suitable synthetic material. The sports facilities will have 2 soccer doors and 2 basketball baskets. The entire playground will be surrounded by a metal fence made of metal poles on a concrete foundation and a thick wire mesh with polymer coating. The project provides an accessible environment for people with disabilities. For the needs of the visitors is provided drinking water from the fountain. The water supply of the plot with drinking water will be realized by the village water supply network. Wastewater will be discharged into the city sewage system. There is no vegetation in the plot, and there are two planters to be planted between the two sports grounds.
Overview
Status | Contracted |
---|---|
Start date | 10 May, 2019 |
End date | 10 May, 2022 |
Contract date | 10 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 87,676.70 |
---|---|
Grant | 87,676.70 |
Self finance | 0.00 |
Total paid | 43,838.35 |
EU participation percent | 85.0% |
Location