"Construction and equipment of sport playground in distr. "Mladost" - town of Popovo ".

The project for construction of a sport playground in the distr. of "Mladost" includes construction of sports grounds, alley network, park furniture, construction of technical infrastructure - electricity network, fence. There are sports facilities that should be removed because they are depreciated and do not fit the new distribution at the site. The fence is also old and depreciated and intended to be removed. Asphalt - Playground - in the project are planned - repair of the old pavement and making of new in the unpaved parts. The old pavement will be cut at the end to form the transition from old to new pavement. It is asphalted to the concrete base of the new fence. - Metal fence - the new metal fence has a length of 176 meters and a height of 4 meters. Entrance is from the south and east sides of the site. There will be openings at the base of the fence at the level of the asphalt to ensure drainage of the rainwater. In the southern and eastern part, where the entrances are located, the foundation will be at the level of the asphalt pavement. The length of these sections of the fence will be at least 4 meters in order to ensure the passage of the equipment during the execution of the construction works and, if necessary, after the completion of the activities. - Inner fence - separates the combined basketball and volleyball court from the fitness center. Sports equipment and facilities: - fitness training facility for hands -1 pcs. - fitness equipment for rowing -1 pcs. - fitness facility - single bed -1 pc. - Fitness equipment for cardio workout -1 pcs. - fitness equipment for back -1 pcs. - fitness equipment for the femoral and muscular muscles -1 pcs. - combined street fitness facility -1 pcs. - minifotball doors with net - 2 pcs. - Basketball basket with net - 2 pcs. - Volleyball columns - 2 pcs. - Volleyball net - 1 pc. Park furniture - benches - 35 pcs. - bins for waste - 5 pcs.

Comments
Leave a comment

Overview

Status Contracted
Start date 15 May, 2019
End date 15 May, 2022
Contract date 15 May, 2019
View in UMIS

Financial information

Total cost 97,534.36
Grant 97,534.36
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location