The current project is for "Combined sports playground for football, basketball and volleyball in the town of Antonovo". The project refers to an object that is multifunctional playground for mini football and volleyball, with artificial grass, fence and lighting and includes: Playground with dimensions 20,00 / 30,00m: - Play field for mini football - 18,00 / 28,00m - a safe area on each of the four sides - 1.00 meters; Volleyball court; outlines - 9.00 / 18.00m; Basis of the course - drainage fraction / crushed stone 37 cm thick: - a layer 20 cm thick - a fraction of 11-22 mm; - layer 15 cm thick - fraction 4 -11 mm; - layer of siliva with a thickness of 2 cm - fraction 0 - 4 mm; - Geotextile is placed on the last layer of a fraction; Drainage system; Artificial grass flooring of 40 mm height with silicone filling and rubber granules; Mark for mini football - white and yellow; Volleyball marker - yellow; Fence: From 0 to 6 m will be mounted: - fencing pillars u 60,3x3,5 mm, height 6 m above ground (7 length); - PE network, φ3,5 mm; - Stranded 3 / 4mm rope with PVC cover; - 1 piece. single door with a width of 1m. Garden curbs along the perimeter of the course; Installation of a drainage system according to the project on water supply and sewerage. It is planned to install 4pcs. staircase for illumination with 4pcs. metal halide projectors at 400W. The pillars are steel, with a height of 8m. The cross-section of the ladder decreases in height starting at n 180 and reaching f60. The posts are mounted by means of an anchor group on reinforced concrete foundation with dimensions of the base plan in plan: 120x120cm (sub column 60x60cm), height h = 1.30m and pitch height 30cm. Constructions are calculated for gravitational loads and wind and are dimensioned for first and second groups of boundary states according to the applicable design rules in Bulgaria.

Comments
Leave a comment

Overview

Status Contracted
Start date 03 May, 2019
End date 03 May, 2022
Contract date 03 May, 2019
View in UMIS

Financial information

Total cost 86,816.43
Grant 86,816.43
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location