This project solution envisages the construction of a separate sports playground - a volleyball court. The course will be located within the courtyard of the school, with its orientation and dimensions (18.0 / 9.0 m internal contour, with 24.0 / 12.0 m outer strips) conforming with the specifics of the site and standards for the design of sports buildings and facilities. Controlled access to the sports ground is created by means of an open-air fence with length L = 60 m'The fence is fitted with a 300/300 cm sliding access door. No installation and lighting of the object are foreseen, as the course will be used only in the light of day. A 300/300 cm sliding door is mounted in the fence. Up to 100 places for visitors
Overview
Status | Contracted |
---|---|
Start date | 08 May, 2019 |
End date | 08 May, 2022 |
Contract date | 08 May, 2019 |
Programme
Beneficiary
Financial information
Total cost | 94,352.72 |
---|---|
Grant | 94,352.72 |
Self finance | 0.00 |
Total paid | 46,848.93 |
EU participation percent | 85.0% |
Location