Major repairs for introduction of energy efficiency measures in Administrative building B of Dulgopol municipality - Dalgopol and Multifunctional building "Mladost" - Dulgopol

The project objectives, described, are directly in line with the specific objective of the procedure through selection BG06RDNP001-7.008 - Energy Efficiency "Reconstruction, renovation, equipment and / or furnishing of municipal buildings in which public services are provided to improve their energy efficiency" under sub-measure 7.2. "Investments in the creation, improvement or extension of all types of small scale infrastructure" of Measure 7 "Main services and renovation of rural areas" of the Rural Development Program 2014-2020). By implementing the objectives and activities, the project will directly contribute to the reduction of greenhouse gas emissions (including CO2 emissions). All of this, in turn, contributes to the sustainable convergence of the level of economic and social development of Dulgopol Municipality. The project proposal is intended for intervention and is of utmost importance and role in the development of the municipality. One of the main problems faced by the Dulgopol Municipal Administration is to find a quick and effective solution that will lead to the saving of financial resources of the municipality by introducing energy efficiency measures in line with the Energy Efficiency Act, rapid and dynamic development, such as Dulgopol, developing economy and growing population. Looking for ways, means and means to improve efficiency as a whole, and at the same time introducing energy efficiency measures and improving the living standards of the population, as well as ensuring a healthy balance and a healthy environment, the Dulgopol Municipality develops conceptual projects exclusively in this direction.

Comments
Leave a comment

Overview

Status Contracted
Start date 04 Nov, 2019
End date 04 Nov, 2022
Contract date 04 Nov, 2019
View in UMIS

Financial information

Total cost 211,728.12
Grant 211,728.12
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location