"Reconstruction, repair, equipment and furnishing of municipal buildings in order to improve their energy efficiency" located in the village of Vladimirovo, Ohrid and Pali lula village, Boychinovtsi municipality

With the project proposal "Reconstruction, repair, equipment and furnishing of municipal buildings in order to improve their energy efficiency" located in the villages of Vladimirovo, Ohrid and Pali lula, Boychinovtsi municipality "is planned in the mayoralties of Vladimirovo village, village Ohrid and the village of Palli lula to introduce energy saving measures (EMS) prescribed and justified by the energy efficiency audit of the building (EEE) The implementation of the prescribed ECM in the project envisages the implementation of the accompanying construction and assembly works, to achieve the end result and its resilience, as well as to restore the initial condition damaged as a result of the renovation The envisaged measures for achieving energy efficiency in the building are as follows: Town Hall of Vladimirovo: 1. ECM 1 - Thermal insulation of external walls; 2. ECM 2 - Replacement of joinery; 3. ECM 3 - Thermal insulation of a floor bordering an unheated basement; 4. ECM 4 - Thermal insulation of roof; 5. ECM 5 - Replacement of lighting fixtures; 6. ECM 6 - Building an installation to maintain a comfortable microclimate in the building. Town Hall Ohrid: 1. ECM 1 - Thermal insulation of external walls; 2. ECM 2 - Replacement of joinery; 3. ECM 3 - Thermal insulation of a floor bordering an unheated basement; 4. ECM 4 - Thermal insulation of roof; 5. ECM 5 - Replacement of lighting fixtures; 6. ECM 6 - Building an installation to maintain a comfortable microclimate in the building. Town Hall of Pali lula: 1. ECM 1 - Thermal insulation of external walls; 2. ECM 3 - Thermal insulation of a floor bordering the foundation; 3. ECM 4 - Thermal insulation of roof; 4. Building an installation to maintain a comfortable microclimate in the building.

Comments
Leave a comment

Overview

Status Contracted
Start date 21 Nov, 2019
End date 21 Nov, 2022
Contract date 21 Nov, 2019
View in UMIS

Financial information

Total cost 214,427.55
Grant 214,427.55
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location