This project proposal plans the implementation of the second stage of the project for modernization and reconstruction of an existing fishing port in Pomorie, city of Pomorie. In addition to the planned construction works, tangible and intangible assets supporting the port activity will be purchased. The project will also be secured by the relevant services necessary for its implementation. The investments are intended to cover the following selection criteria: - improving the conditions under which fishery products are unloaded, processed, stored in the port and sold - Construction works Western Protective Mall from profile 1 to profile 5; purchase of refrigerator truck, shock-freezer, stationary crane; vertical freezer; pontoons; - construction, modernization and extension, improving safety - Construction works Western Protective Mall from profile 1 to profile 5;Construction works metal hall/workshop for fishing vessels; purchase of a mobile crane; rescue boat, service boat; lathe; full video surveillance system; - Provision of fuel, ice water and electricity - Construction works Western protective mall; purchase pontoons; mobile gas station; vertical freezer; - Improving control and traceability of fishery products - Full video surveillance system; software; hardware; - Processing and storing of the waste - purchase of a motor-sweep; waste collection containers; composting vessels; - the provision of more than 10 places of fishing vessels over 18 m - currently at Zone C in the existing port 12 vessels of length up to 18,50 m or 8 vessels of length up to 25,50 m or a combination of can dock in the port. After the construction of Zone E, subject of this project, it will be possible another 4 vessels up to 18, 50 m in length to dock in the port; - Use of unwanted catches - purchase of a vertical freezer; shock freezer.
Overview
Status | Contracted |
---|---|
Start date | 27 Mar, 2019 |
End date | 27 Mar, 2021 |
Contract date | 27 Mar, 2019 |
Programme
Beneficiary
Financial information
Total cost | 6,245,116.25 |
---|---|
Grant | 6,245,116.25 |
Self finance | 0.00 |
Total paid | 3,608,001.65 |
EU participation percent | 75.0% |
Location