"Improving the safety and working conditions of fishermen in the fishing port "Chaika", Byala, Varna region"

The project includes equipment for a boat dock in the waters of the Port of Chaika, Byala. The boat dock includes a pontoon facility, which will allow housing 160 pcs. fishing boats. The target group of the project or those who will use the boat dock are fishermen representing small-scale fishing. The separate boat dock will be equipped with pontoons, and the purchase of 14 pcs. pontoon piers with marine aluminum construction with a total length of 168 m and a width of 2.5 m, including 6 pcs. walkway 1.24 m, 40 pcs. fingers, 150 pcs. aluminum mooring bolt with resistance of 2.5 t, 14 pcs. columns for power supply and water supply of vessels, 34 pcs. anchor 1.5 m, 650 m chains F20, 70 pcs. Shegeli F20. Delivery, installation and anchoring of the facility is planned. After that it will be registered as a boat dock in the Executive Agency Maritime Administration / IAMA /. The project also includes the purchase and installation of 32 units. IP video surveillance cameras with a range of up to 50 m, delivery and installation of 32-channel 4K network recorder / server, delivery and installation of a workstation, delivery and installation of a 23.5 "LED monitor, delivery and installation of a router, 19" communication cabinet, delivery and installation of software for centralized monitoring of network devices, delivery and installation of USB joystick for control of DVR / NVR recorders and PC client software for video monitoring, delivery and installation of uninterruptible power supply, delivery and installation of waterproof metal panel IP66, Delivery and installation of Industrial Full Gigabit 6-port PoE network switch, delivery and installation of SFP module, Delivery and installation of STP shielded cable, fasteners for 1 point and configuration of video surveillance system.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 09 May, 2022
End date 30 Nov, 2023
Contract date 09 May, 2022
View in UMIS

Financial information

Total cost 748,793.42
Grant 748,793.42
Self finance 0.00
Total paid 0.00
EU participation percent 73.26%

Location

Bulgaria, North and South East Bulgaria (BG3), North-East (BG33), Varna (BG331), Byala, Byala