"Bilyana" Ltd. is a company founded in 1992, registered under commercial and fisheries law, with main activity "production of pork meat, hatching and breeding animals, piglets, other livestock, fish, meatproducts, hides, grains, fodder etc…". Shareholders of the company are Lefter Evstatiev Lefterov with 51.08% and Evstati Lefterov Lefterov with 48.92%. The sole manager of the company is LefterLefterov. The Company owns a pig farm in existing livestock complex, situated in Bulgarian Slivovo village, Svishtov Municipality. With the current project, the company will introduce a new policy in diversification of livestock production by making investments in aquaculture for the production of high quality marine crustaceans species, while maintains low levels of production costs. The candidate will build in a new production building innovative for the Republic of Bulgaria (and within the EU) salt water closed recirculating system, which water source is an existing private well drilling, with flow of 4 l / s, in which water will be added specialized salt to achieve optimal growing conditions for the shrimps. Subject to cultivation will be the Pacific White shrimp with Latin name Litopenaeus vannamei, formerly classified as Penaeus vannamei. For the design of the farm, "Biljana" Ltd. used the technology and experience of certified engineers from the Netherlands, who have extensive experience with construction and operation of shrimp farms. The farm will be full system - performing the breeding cycle - from hatching larvae from own brood stock to grow out, which production will supply the market with consumable size shrimps. It will be installed renewable energy source - geothermal installations tempering the technology process. With the implementation of planned activities, and usage of renewable energy will be ensured positive annual cash flows, which define the project as extremely profitable. "Bilyana" Ltd. declares 65 points in the ranking of project proposals.
Overview
Status | In execution (starting date) |
---|---|
Start date | 14 Mar, 2018 |
End date | 14 Sep, 2019 |
Contract date | 14 Mar, 2018 |
Programme
Beneficiary
Financial information
Total cost | 1,416,123.63 |
---|---|
Grant | 708,061.83 |
Self finance | 708,061.80 |
Total paid | 707,603.69 |
EU participation percent | 75.0% |
Location