Farm and hatchery for intensive growth of turbot (psetta maxima) in recirculation system.

Planned is a construction of a farm for growth of turpot in recirculating system with area 1406 m2. Delivery, construction and commisioning of: 1. Section "Quarantine and growth of uterine herd" with area 220 square meters 2. Section "Hatchery" with area 144 m2 3. Section "Youth" with area 174 m2 4. Section "Fattening" with area 430 m2. These production capacities will allow annual production of 30 tons of turbot for consumption, fertile material for own production and for selling to other farms in the country and abroad

Comments
Leave a comment

Overview

Status Terminated (termination date)
Start date 29 Mar, 2018
End date 29 Sep, 2019
Contract date 29 Mar, 2018