"Improvement of Rideau Park - Stage III - Construction of an asphalt road from an existing parking lot, east of the Rideau restaurant to the beginning of the terrain designated as an extreme bike lane. Construction of an extreme bike lane and outdoor fitness for disadvantaged people"

The project proposal envisages Improvement of Rideau Park-Stage III-Construction of an asphalt road from an existing parking lot, east of the Rideau restaurant to the beginning of the terrain designated as an extreme bike lane. Construction of an extreme bike lane and outdoor fitness for disadvantaged people.The activities under the project proposal are directly related to the small-scale infrastructure of the region, and to the development and promotion of the identity on the territory of FLAG Samokov. The implementation of the PP will contribute to increasing the attractiveness of the fishing area.There is a paved path in the described terrain. The site passes through wooded areas of mixed woody vegetation on the territory of the FLAG. The species composition is in accordance with the non-anthropogenic species composition of the forest area where the site is located, namely-Rideau Park.The site "Improvement of Rideau Park" - third stage, covers an existing road that starts from the parking lot and reaches the stadium. The route has an average width of 4.50-6.00 m and has deep tracks. No nastica. The axis and boundaries of the existing road are preserved and extensions are made in some places. The new areas thus formed are improved. The terrain is mountainous, with slopes in places over 10%. Within the scope of the project there is an existing stadium, with grass cover and missing furniture. The terrain around it is favorable for the placement of openwork observation facilities (amphitheater benches, similar to grandstands). The project development does not envisage affecting the existing large-sized tree and bush vegetation.Overall, the existing vegetation is in relatively good condition. adjacent terrain is favorable for environmentally friendly location of recreation areas, alleys and playgrounds.The terrain has a huge potential for environmentally friendly improvement. There are areas free of trees and bushes, which allow the placement of forest park elements.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 05 Jan, 2021
End date 05 Jan, 2023
Contract date 05 Jan, 2021
View in UMIS

Financial information

Total cost 391,153.33
Grant 391,153.33
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location