The project proposal includes renovation of a plot of land designated for landscaping in PI 15285.8.515, LPR I - for a garden and a shop, quarter 92 of the PPP of the village of Govedartsi, Samokov Municipality. The existing garden, subject of the project solution is of high social significance for the residents and guests of the settlement. The terrain, subject of the design solution, is partially fenced with a metal openwork fence and with a fence net of metal stakes, poorly maintained, with corroded elements. The green area is swampy. There are lawns and large woody vegetation. The available vegetation is not taken care of. A river flows through the terrain and flows into the Cherni Iskar River. The river has been repaired, in poor condition, with an uncleaned riverbed of sediments, broken branches, bushes, grass and more. There is a landscaping of the terrain, which includes a water area - swimming pool, water cascade, decorative retaining walls, an external ladder to overcome the displacement of the terrain, alleys, two bridges for crossing the river and alley lighting. The condition of the elements of the landscaping described above is very bad. The activities of the project proposal are directly related to the small-scale infrastructure of the region, and to the promotion of the identity on the territory of FLAG Samokov. The implementation of the project proposal will contribute to increasing the attractiveness of the fishing area. In particular, the project provides for: Drainage of the terrain; Restoration of existing water area - pool, water cascade; Rehabilitation and renovation of the terrain; Construction of new alleys and stairs to overcome the displacement of the terrain; Construction of recreation areas; Replacement and new sidewalks, curbs, including the ladder; Installation of garden and park elements - benches, benches with pergolas, gazebos, bins for household waste, etc. Repair and restoration of alley lighting
Overview
Status | In execution (starting date) |
---|---|
Start date | 05 Jan, 2021 |
End date | 05 Jan, 2023 |
Contract date | 05 Jan, 2021 |
Programme
Beneficiary
Financial information
Total cost | 210,000.00 |
---|---|
Grant | 210,000.00 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location