This project is related to the construction of a Cooling, freezing and packaging frozen shrimps (own production) grown throughout the year using the 'super-intensive growth' method in closed recirculating systems (Recirculating aquaculture systems or RAS).The plant will be built in a zoned land plot/ ZLP / I-64, q.153, Stopanski dvor Area, lands of Suvorovo, Suvorovo municipality. The investment project envisages the construction of the following buildings: 1. Building-3 providing sanitary-household conditions for manufacturing staff 2. Building-4 for placing the technological equipment, refrigeration equipment and storage equipment. It will be divided into a room for raw material intake, a working room, a dry warehouse for packaging materials, a refrigerating chamber-entrance hall, a refrigerating premise containing a shock freezer and a refrigerating chamber for storing the finished products in a frozen state. Building 3 and Building 4 will be connected and located in the eastern part of the ZLP near the street regulation. "NEPTUN VA" Ltd. envisages the development and implementation of the following standards: 1. International Standard ISO 45001, which defines the requirements for the health and safety management system in the enterprise during work. The main focus of the standard is the continuous identification of hazards, risk assessment and management to reduce the possibility of accidents related to the health and safety of workers, which in turn implies providing better working conditions. 2. International standard IFS Food which defines the requirements for the food quality and food safety management system. The main focus of the standard is the monitoring of the requirements for the production and realization of finished products. Most of the products / frozen shrimp / will be sold on foreign markets and a smaller part -on the domestic market, according to the buyout requests.
Overview
Status | Terminated (termination date) |
---|---|
Start date | 10 Sep, 2019 |
End date | 10 Mar, 2021 |
Contract date | 10 Sep, 2019 |
Programme
Beneficiary
Financial information
Total cost | 0.00 |
---|---|
Grant | 0.00 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 0.0% |
Location