Struma Motorway – Lot 3.1, Lot 3.3 and Zheleznitsa Tunnel

The project Struma MW Lot 3 Blagoevgrad - Sandanski is part of the global project Struma MW, located in the southwestern part of the country, passing through district of Blagoevgrad, with an approximate length of 134 km and is divided into the following sections: - Section from Dolna Dikanya to Dupnitsa - Lot 1 of Struma Motorway (from km 305 + 220 to km 322+000) with a length of 16,780 km; - Section from Dupnitsa to Blagoevgrad - Lot 2 of the Struma Motorway (from km 322 +000 to km 359+ 483) with a length of 37,480 km; - Section from Blagoevgrad to Sandanski - Lot 3 of Struma Motorway (from km 359 +000 to km 420 +624) with a length of 65,090 km; - Section from Sandanski to the border crossing with Greece - Lot 4 of Struma Motorway (423 + 800 tokm 438 +500) with a length of 14,700 km. The project, which is the subject of this application includes design and construction of: - Lot 3.1 from Blagoevgrad to Krupnik from km 359 +000 to km 373 +300, with the respective junctions, earth works and facilities, including a section of 4.4 km with Zheleznitsa Tunnel; - Lot 3.1Zheleznitsa Tunel with a total length of 4.4 km, including Zheleznitsa Tunnel with a length of 2.012 km; - Lot 3.3 from Kresna to Sandanski from km 397 +600 to km 420 + 624 = 420 + 628.478 with the respective junctions, earthworks and structures. The construction of Lot 3 of Struma motorway is a major priority of the Operational Programme Transport and transport infrastructure (OPTTI) 2014-2020. The construction of Lots 1, 2 and 4, as well as the preparation of Lot 3 is financed under OP Transport 2007-2013. Design and construction of Lot 3.2 Krupnik-Kresna from km 375 +900 (according to preliminary studies from 2016) = 376 +000 to km 400+ 371.81 (according to preliminary studies from 2016) = 397 +000 is not part of this application including section 373+300 to 376+000 of Lot 3.1 and section 397+000 to 397+600 of Lot 3.3

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 24 Sep, 2015
End date 30 Sep, 2023
Contract date 24 Sep, 2015
View in UMIS

Financial information

Total cost 742,502,905.55
Grant 736,765,596.57
Self finance 5,737,308.98
Total paid 588,111,718.96
EU participation percent 85.0%

Location