Integrated water project of Plovdiv - Stage 1

This project is submitted pursuant to the invitation to apply under procedure №BG16M1OP002-1.006 "Implementation of the early water supply projects." With the implementation of the project will ensure optimal removal and treatment of wastewater collected in sewer networks that are currently discharged without appropriate enough purification that meets the goals set by Directive 91/271 / EEC requirements. In the present project proposal includes the following measures concerning sewer, replacement of 13.428 km secondary sewerage network in order to reduce the infiltration flow to the wastewater treatment plant (WWTP); Rehabilitation of Main collector VII and construction of a new collector length 2.746 km to ensure sufficient hydraulic capacity of the system. The approved project for reconstruction, modernization and completion of the WWTP - Plovdiv will reduce the flow of pollutants and boigenni elements in the receiving water. Wastewater treatment will enable reliable and stable technology to achieve compliance with European standards for water discharged waste water treatment plants in economically favorable terms. With the implementation of the project will be optimized process for sludge treatment, including sludge stabilization, mechanical removal of water and heat drying sludge and use of biogas.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 04 Apr, 2018
End date 30 Jun, 2024
Contract date 04 Apr, 2018
View in UMIS

Programme

Financial information

Total cost 115,334,116.42
Grant 80,681,485.78
Self finance 34,652,630.64
Total paid 9,233,056.85
EU participation percent 85.0%

Location