Completion of water quantity monitoring networks

Upgrading and/or optimizing groundwater quantity monitoring networks, incl. – development of information maps; assessment of the structure and the state of existing monitoring points; impact analysis of groundwater abstraction on existing monitoring points and on ones envisaged to be built;-identifying requirements and measures to prevent lowering of water levels in the selected points from the monitoring network; identifying the structure and equipment of monitoring points;- assessment of the structure and the state of existing monitoring points; development of proposal for replacement of monitoring points;- assessing the need of additional expansion of monitoring networks;- survey on land ownership of the sites monitoring points are to be built;-substantiate the construction of new and or restoring existing monitoring points and substantiate equipment to be installed or the use of portable monitoring devices;-development of proposal/guidance for upgrading /complementing monitoring networks and programmes. Building new groundwater quantity monitoring points. Equipment of existing and newly built qroundwater monitoring stations with measurement devices. Design and justification of expansion (optimization) of surface water monitoring networks; incl.-analysis of existing points;-analysis of geographical location and necessary measurements of water quantity; - identifying the sites for setting up monitoring points;- ;- survey on land ownership of the sites monitoring points are to be built;- substantiate equipment for monitoring points; identification of necessary activities for the construction of monitoring points; development of proposals/ guidance for upgrading /complementing monitoring networks and programmes. Building new surface water monitoring points and their elements. Supply of equipment for monitoring on site. Carrying out and participating in relevant activities. Activities for technical assistance in project preparation.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 09 Oct, 2017
End date 09 Mar, 2022
Contract date 09 Oct, 2017
View in UMIS

Programme

Financial information

Total cost 14,999,898.82
Grant 14,999,898.82
Self finance 0.00
Total paid 1,716,157.70
EU participation percent 85.0%

Location