Construction of water supply and sewerage infrastructure on the designated territory serviced by Water Supply and Sewerage Ltd. - Vratsa

- Under Water Supply component: • for Vratsa: reconstruction of the water main from HP 13 000 m3 to HP 6 200 m3 with a length of 0,785 km; • for Vratsa: reconstruction and completion of a 23,025 km water supply network, construction of two new PRV shafts, and a new water meter shaft; • For Mezdra town: reconstruction and completion of 8,272 km of water network, as well as the construction of two new PRV shafts, as well as eight new water meter shafts; • for Kozloduy: Reconstruction and completion of a 12,218 km water supply network, construction of one PRV shaft, and three new water meter shafts; • for the town of Byala Slatina: Reconstruction and completion of a 10,478 km water supply network, as well as the construction of four new water meter shafts - Under Discharge component: • Vratsa agglomeration: completion of a sewerage network with a length of 3,946 km; • Kozloduy agglomeration: completion of the 11,411 km sewerage network; • White Slatina agglomeration: completion of the 6,505 km sewerage network, construction of new sewage branches for domestic waters in the northern zone of the city; • Agglomeration Mezdra: completion of a sewerage network 0,878 km and reconstruction of 0,970 km of sewerage network For each agglomeration in the sewage branches foreseen for completion, sections of main collectors and sections of the internal network are included. Investments include the inclusion of existing service connections and the construction of new service connections, where necessary, the construction of facilities of the sewerage network. For each of the 4 agglomerations, a monitoring system for the sewerage network is planned. - Under the Treatment component, the following is foreseen: • WWTP Vratsa: construction of a shelter on dehydrating fields for temporary storage of dehydrated sludge; • WWTP Kozloduy: construction of a site with a shelter for the temporary storage of dehydrated sludge.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 18 Jul, 2019
End date 18 Jan, 2024
Contract date 03 Jul, 2019
View in UMIS

Programme

Financial information

Total cost 50,019,303.65
Grant 36,347,360.66
Self finance 13,671,942.99
Total paid 162,665.96
EU participation percent 85.0%

Location

Vratsa (BG313)