The project provides investment activities for agglomerations with more than 10,000 PE. for the separate territory, serviced by VIK EOOD - Yambol, as follows: ABOUT YAMBOL AGGLOMERATION: By water supply component: - Construction of new cast-iron plumbing from PS Kabile to PS Ormana; - Stage replacement of a part of the internal water supply network and building water supply deviations. - Construction of a shaft with a pressure regulator with an ultrasonic flowmeter; - Construction of 4 shafts with pressure regulators; - Introduction of new points for measuring the water quantity and pressure on the Yambol waterworks network and their integration into the system for monitoring of data and trends; - Installation of pressure sensors. - Upgrading SCADA and GIS. By waste water collection component: - Reconstruction of sections of the sewerage network; - Reconstruction of the pressure pipeline from the KPS "Bikov Most"; - Reconstruction of 1 pc. rainstorm in front of the KPS "Hristo Botev"; - Reconstruction of KPS "Bikov Most"; - Construction of sewerage from the crossing of "Bitolya" Street to the KPS "Vazrazhdane"; - Switching Master Collectors to Main Collector I; - Construction of a new sewerage on Bitolya Street; - Switching part of the sewerage to a central city area; - Construction of a new KPS "Hristo Botev"; - Construction of 3 pcs. new rainstorms; - Establishment of a control and management system for the reconstructed sewerage pumping station "Bikov most". ABOUT ELHOVO AGLOMERATION: By water supply component: - Reconstruction of part of the external incoming water mains to the town of Elhovo; - Stage replacement of part of the internal water supply network and building plumbing deviations in the town of Elhovo; By waste water collection component: - New sewerage network in the town of Elhovo; - Replacement of a sewerage network in the town of Elhovo. By component wastewater treatment no measures are foreseen.
Overview
Status | In execution (starting date) |
---|---|
Start date | 12 Sep, 2019 |
End date | 12 Mar, 2024 |
Contract date | 28 Aug, 2019 |
Programme
Beneficiary
Financial information
Total cost | 31,231,619.65 |
---|---|
Grant | 23,241,530.29 |
Self finance | 7,990,089.36 |
Total paid | 3,880,761.96 |
EU participation percent | 85.0% |
Location