Completion and reconstruction of water supply and sewerage systems in a separate territory serviced by company "Water supply and sewerage - Yambol"

The project provides investment activities for agglomerations with more than 10,000 PE. for the separate territory, serviced by VIK EOOD - Yambol, as follows: ABOUT YAMBOL AGGLOMERATION: By water supply component: - Construction of new cast-iron plumbing from PS Kabile to PS Ormana; - Stage replacement of a part of the internal water supply network and building water supply deviations. - Construction of a shaft with a pressure regulator with an ultrasonic flowmeter; - Construction of 4 shafts with pressure regulators; - Introduction of new points for measuring the water quantity and pressure on the Yambol waterworks network and their integration into the system for monitoring of data and trends; - Installation of pressure sensors. - Upgrading SCADA and GIS. By waste water collection component: - Reconstruction of sections of the sewerage network; - Reconstruction of the pressure pipeline from the KPS "Bikov Most"; - Reconstruction of 1 pc. rainstorm in front of the KPS "Hristo Botev"; - Reconstruction of KPS "Bikov Most"; - Construction of sewerage from the crossing of "Bitolya" Street to the KPS "Vazrazhdane"; - Switching Master Collectors to Main Collector I; - Construction of a new sewerage on Bitolya Street; - Switching part of the sewerage to a central city area; - Construction of a new KPS "Hristo Botev"; - Construction of 3 pcs. new rainstorms; - Establishment of a control and management system for the reconstructed sewerage pumping station "Bikov most". ABOUT ELHOVO AGLOMERATION: By water supply component: - Reconstruction of part of the external incoming water mains to the town of Elhovo; - Stage replacement of part of the internal water supply network and building plumbing deviations in the town of Elhovo; By waste water collection component: - New sewerage network in the town of Elhovo; - Replacement of a sewerage network in the town of Elhovo. By component wastewater treatment no measures are foreseen.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 12 Sep, 2019
End date 12 Mar, 2024
Contract date 28 Aug, 2019
View in UMIS

Programme

Financial information

Total cost 31,231,619.65
Grant 23,241,530.29
Self finance 7,990,089.36
Total paid 3,880,761.96
EU participation percent 85.0%

Location

Yambol (BG343)