In total, for Vidin agglomeration, the following measures are envisaged: - by Water supply component: • Replacement of the existing conductive plumbing pipe 900mm with PVC_O pipes with diameter Φ630mm, L = 10,372km with PN 12,5 atm; • Replacement of the existing two 550 mm fired eternit pipes and the existing two 630 mm steel tubes with PVC 500 pipes with PN 12.5 atm and total length L = 4149km; L total = 14,521km. - under the Waste water discharge component: • Reconstruction of part of Main Collector II with oval profile 1520/2400 mm and 1120/2150 mm. It will be replaced with a GRP channel with φ1800mm length L = 1.356km and a section with PP pipes 2xf1000mm with L = 94m when passing under the railway. the line; L total = 1,450km. No investment measures are foreseen under the Wastewater Treatment component. WWTP is in the process of construction.
Overview
Status | In execution (starting date) |
---|---|
Start date | 05 Sep, 2019 |
End date | 05 Mar, 2024 |
Contract date | 21 Aug, 2019 |
Programme
Beneficiary
Financial information
Total cost | 23,653,635.80 |
---|---|
Grant | 17,937,564.47 |
Self finance | 5,716,071.33 |
Total paid | 384,743.65 |
EU participation percent | 85.0% |
Location