"Completion and reconstruction of water supply and sewerage systems in a separate territory, serviced by VIK EOOD, Plovdiv, Bulgaria"

The project "Completion and reconstruction of water supply and sewerage systems in a separate territory, serviced by VIK EOOD, Plovdiv, Bulgaria" was prepared on the basis of a Regional Pre-investment Survey (RIPP), developed by the Ministry of Regional Development and Public Works (MRDPW) grant from the OPE 2014-2020 of procedure BG16M1OP002-1.001 "Supporting the Regional Investment Planning of the Water Supply and Sewerage Sector". The main activities envisaged within the project are as follows: - "Reconstruction and construction of sewerage and water supply networks of Plovdiv"; - "Reconstruction and construction of a sewerage network in the town of Hissarya"; - "Reconstruction of the incoming plumbing line from" South-West "to Plovdiv; - "Reconstruction of lead-in water supply from" Sever "to Plovdiv; - "Reconstruction of a conduit from Katunitsa to 50m3 Disconnection shaft, Asenovgrad"; - "Reconstruction of the water supply network of the town of Karlovo"; - "Reconstruction of incoming water supply line from HP 2500m3 to PC III upstream - Parvomay"; - "Reconstruction of an incoming water pipeline from Stamboliyski to the regulation of the town of Stamboliyski". With the implementation of the project will be increased the collected and treated pollution load before discharging the waste water into water bodies, water losses in water transmission networks will be reduced and the water supply of the population will be improved in a separate territory, serviced by "VIK" Ltd. Plovdiv. The implementation of the project will contribute to the achievement of specific objective 1 "Preservation and improvement of the state of the water resources" of priority axis 1 "Waters" of OPE 2014-2020.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 12 Sep, 2019
End date 12 Mar, 2024
Contract date 28 Aug, 2019
View in UMIS

Programme

Financial information

Total cost 137,830,825.33
Grant 97,480,851.19
Self finance 40,349,974.14
Total paid 0.00
EU participation percent 85.0%

Location

Plovdiv (BG421)