Scope of activities: Water supply: - Reconstruction of int. water. network Stara Zagora - DMA zones 1, 2, 3, 4, 5, 6 - south and low water pipelines accompanying rec. sewerage - 10 619 m. and 402 service connections (SC) - Rec-n of int. wat. network of Stara Zagora DMA zones 6 North - 7, 8, 9, 10, 11, 12, 13, 14 - 29 919 m and 1 712 SC - Rec-n of distr. water main from reservoir V = 11 000 m³ to OS 9, WS St. Zagora - second highway deviation - 4 126 m. + 215,00 m casing pipes; - Rec-n of incoming water main from the WS "Dunavtsi Stara Zagora" - 7 343 m. + 162 m. casing pipes - Rec-n of int. wat. network of Kazanlak DMA zones 1, 2 and 3 - 20 476 m and 1 370 SC - Rec-n of incoming water main from from Sahrane collection room to the pumping reservoir V = 2000m3 at the CPC in Kazanlak - 12 446 m. + 183 m. casing pipes - Rec-n of int. wat. network of Chirpan - 989 m. and 66 SC - Rec-n of incoming water main from Maritza water source from km.4 + 943 to reservoir V = 6500m3 of Chirpan - 5 431m. + 17 m. casing pipes - Rec-n of int. wat. network of Radnevo - 2 258 m. + 50 m. casing pipes - Rec-n of incoming water main from Kovach water tower to the Znamenosets RS for Radnevo - 3 747 m. + 46 m. casing pipes - Construction of 8 new pipe wells in villages of Han Asparuhovo and Gorno Botevo, municipality St.Zagora Wastewater discharge: - Rec-n of int. sew. network of Stara Zagora - catchment area of a collector along Slavyanska Str. and collectors discharging in the Main Coll. I - 6 620 m. + 1 028 SC - Rec-n of int. sew. network of Stara Zagora - catchment area of a collector along Boruygrad Str. and collectors discharging in the main Coll. I, II and II '- 10 007 m. + 357 SC - Rec-n of int. sew. network of Kazanlak - 844 m. + 42 SC - Rec-n of int. sew. network of Chirpan - 1 961 m., 210 m. pusher from the CPS and 51 SC Wastewater treatment: -Construction of 20 drying fields and delivery of technological equipment for WWTP Stara Zagora
Overview
Status | In execution (starting date) |
---|---|
Start date | 30 Oct, 2019 |
End date | 30 Apr, 2024 |
Contract date | 15 Oct, 2019 |
Programme
Beneficiary
Financial information
Total cost | 121,996,236.26 |
---|---|
Grant | 89,667,233.65 |
Self finance | 32,329,002.61 |
Total paid | 9,392,293.31 |
EU participation percent | 85.0% |
Location