Construction of water supply and sewerage infrastructure on the designated territory served by "Water Supply and Sewerage" Ltd. - Stara Zagora

Scope of activities: Water supply: - Reconstruction of int. water. network Stara Zagora - DMA zones 1, 2, 3, 4, 5, 6 - south and low water pipelines accompanying rec. sewerage - 10 619 m. and 402 service connections (SC) - Rec-n of int. wat. network of Stara Zagora DMA zones 6 North - 7, 8, 9, 10, 11, 12, 13, 14 - 29 919 m and 1 712 SC - Rec-n of distr. water main from reservoir V = 11 000 m³ to OS 9, WS St. Zagora - second highway deviation - 4 126 m. + 215,00 m casing pipes; - Rec-n of incoming water main from the WS "Dunavtsi Stara Zagora" - 7 343 m. + 162 m. casing pipes - Rec-n of int. wat. network of Kazanlak DMA zones 1, 2 and 3 - 20 476 m and 1 370 SC - Rec-n of incoming water main from from Sahrane collection room to the pumping reservoir V = 2000m3 at the CPC in Kazanlak - 12 446 m. ​​+ 183 m. casing pipes - Rec-n of int. wat. network of Chirpan - 989 m. and 66 SC - Rec-n of incoming water main from Maritza water source from km.4 + 943 to reservoir V = 6500m3 of Chirpan - 5 431m. + 17 m. casing pipes - Rec-n of int. wat. network of Radnevo - 2 258 m. + 50 m. casing pipes - Rec-n of incoming water main from Kovach water tower to the Znamenosets RS for Radnevo - 3 747 m. + 46 m. casing pipes - Construction of 8 new pipe wells in villages of Han Asparuhovo and Gorno Botevo, municipality St.Zagora Wastewater discharge: - Rec-n of int. sew. network of Stara Zagora - catchment area of ​​a collector along Slavyanska Str. and collectors discharging in the Main Coll. I - 6 620 m. + 1 028 SC - Rec-n of int. sew. network of Stara Zagora - catchment area of ​​a collector along Boruygrad Str. and collectors discharging in the main Coll. I, II and II '- 10 007 m. + 357 SC - Rec-n of int. sew. network of Kazanlak - 844 m. + 42 SC - Rec-n of int. sew. network of Chirpan - 1 961 m., 210 m. pusher from the CPS and 51 SC Wastewater treatment: -Construction of 20 drying fields and delivery of technological equipment for WWTP Stara Zagora

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 30 Oct, 2019
End date 30 Apr, 2024
Contract date 15 Oct, 2019
View in UMIS

Programme

Financial information

Total cost 121,996,236.26
Grant 89,667,233.65
Self finance 32,329,002.61
Total paid 9,392,293.31
EU participation percent 85.0%

Location

Stara Zagora (BG344)