Design and construction of anaerobic installation for separately collected biodegradable waste on the territory of Regional Waste Management Association (RWMA) Ruse

Through the implementation of the project an anaerobic installation for treatment of the separately collected biodegradable household waste will be built on the territory of RWMA-Ruse.The installation'll serve all municipalities members of RWMA-Ruse.Its nominal capacity has to be 17845 t/year biodegradable waste.Biogas will be generated as a final product,which will provide combined production of electrical energy and heat,as well as compost,suitable for agricultural purposes.Also the following equipment for separate collection of biodegradable waste'll be delivered: Multi-lift containers for separated fractions with capacity 10000-10pcs. Biodegradable separate collection containers-capacity 120l with liquid separation grid-total 2188pcs;Green waste collection containers–Brown containers with capacity 1100 l-total 651pcs; Mobile equipment–total/joint for all municipalities:Dump truck with crane for biodegradable waste and separated fractions 1pc.; Truck with multi-lift system for biodegradable waste and separated fractions 1pc. Mobile equipment-Ruse:Truck for biodegradable waste up-1pc; Mobile equipment-total/joint for all municipalities without Ruse: Truck for biodegradable waste up-1pc Also the following mobile equipment will be delivered: Mobile sieve d=50mm-1pc;Mobile shredder with telescopic loader-1pc;Front loader 4x4-bucket 5m3-1pc;Electrocar-3000kg load capacity-1pc;Cistern 12 m3-1pc;Front loader for CI-1pc A new transformer station'll be built for the accompanying infrastructure and an existing transmission tower'll be connected to it.Cables with approx.length of up to 6 m will be placed next to the complete transformer substation.Off-site connections-building water main and sewer diversion about 25m and off-site rainfall sewerage about 350m-are envisaged for the water supply of the site,as well as for drainage of wastewater,which will be formed.The natural gas supply'll be from a distribution pipeline located about 20m away from the installation.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 25 Apr, 2019
End date 31 Dec, 2023
Contract date 10 Apr, 2019
View in UMIS

Programme

Financial information

Total cost 34,383,754.21
Grant 25,654,841.94
Self finance 8,728,912.27
Total paid 634,686.12
EU participation percent 85.0%