The overall goal of the Project is to reduce the quantity of disposed biodegradable waste generated in municipality Chiprovtsi and municipality Georgi Damyanovo through separate collection and composting of green and/or biodegradable waste. This goal is compliant with the waste management hierarchy and the EU and national objectives for reducing the quantity of biodegradable waste going to landfills. The project contributes also to improving resource efficiency as the infrastructure built under the project will turn the waste into a useful product – compost. The specific objective of the Project is to build the infrastructure needed for separate collection and recovery of green/ biodegradable waste. A composting installation with a capacity 2128 t/y will be constructed that will be located on the territory of the municipality Chiprovtsi, village Beli Mel. As a result of the Project, a composting installation will be constructed and put into operation that will recover separate collected green and/or biodegradable waste from the settlements on the territory of municipality Chiprovtsi and municipality Georgi Damyanovo and will produce quality compost. Equipment for introduction of a new municipal service separate collection of green and/or biodegradable waste will be ensured. The social and economic effects from the implementation of the Project consist in improved quality of the environment by reducing hazardous emissions related to waste disposal; provision of a new waste management service to the citizens and supply of quality compost. New jobs will be created for the operation of the installation built under the Project.
Overview
Status | Closed (completion date) |
---|---|
Start date | 30 Oct, 2018 |
End date | 30 Oct, 2021 |
Contract date | 15 Oct, 2018 |
Programme
Beneficiary
Financial information
Total cost | 3,422,900.64 |
---|---|
Grant | 2,491,491.77 |
Self finance | 931,408.87 |
Total paid | 572,297.25 |
EU participation percent | 85.0% |
Location