The project proposal aims at building a composting plant in a closed facility for biodegradable and green waste on the one hand, and on the other, introducing a pilot system for separate collection of this waste. The present project aims at reducing the amount of landfilled waste by preventing its generation and raising public awareness for adhering to the waste management hierarchy and reducing the amount of landfilled municipal waste by composting the green and biodegradable fraction. The project has a direct contribution to the implementation of Specific Objective 1 of Priority Axis 2 "Waste" of OPE 2014-2020. The introduction of a pilot system for separate collection and recycling of municipal biodegradable and green waste in the municipality of Malko Tarnovo aims at their separate collection and recycling. The project has a direct contribution to the implementation of OPE 2014-2020 Specific Objective 1 of Waste Axis 2. The project activities will be implemented on the Malko Tarnovo municipality.
Overview
Status | Terminated (termination date) |
---|---|
Start date | 08 Sep, 2020 |
End date | 08 Aug, 2022 |
Contract date | 24 Aug, 2020 |
Programme
Beneficiary
Financial information
Total cost | 391,166.00 |
---|---|
Grant | 391,166.00 |
Self finance | 0.00 |
Total paid | 39,116.60 |
EU participation percent | 85.0% |
Location