"Closure and reclamation of a municipal landfill for non-hazardous waste in the city of Tervel"

The solid waste reloading station operates in the town of Tervel. The use of the landfill for non-hazardous waste was discontinued in 2009. The area of ​​the land is 49,533 decares.The area covered by waste is 30.00 decares. The project envisages implementation of: - Technical reclamation - by the in situ method, model B, by waste profiling, triple sealing, intermediate sealing, compacting of the earth masses and construction of a recultivation layer, construction of an insulation system.The technological scheme includes: • Concentration of waste on a smaller area, incl. cleaning and disposal of waste outside the project floor • Profiling (spreading and leveling of waste) • Dusting and leveling of the waste layer • Compaction of waste; • Implementation of a passive gas outlet system (gas outlet fins on the landfill ridge and gas windows); • Construction of a reclamation layer; The technical reclamation will be done through a grant from OPE 2014-2020. Biological reclamation - will be done by applying manure, grass mixtures, making insulation belts and protective landscaping with shrubs. compaction and milling); for slopes - excavation, filling, milling; for the adjacent terrain - shallow plowing, milling and leveling. In all three types the final phase is sowing of grass mixtures. For the three types of biore-cultivation, manure will be imported in quantities - for the ridge - 1 ton, for the slopes - 4.6 tons, for adjacent territories - 7 tons. The funds for the biological reclamation will be provided by the Tervel Municipality after the technical reclamation and completion of the project funded by OPE 2014-2020. Long-term monitoring of environmental and waste components will be carried out.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 20 May, 2020
End date 20 Apr, 2022
Contract date 05 May, 2020
View in UMIS

Programme

Financial information

Total cost 1,126,654.93
Grant 1,126,654.93
Self finance 0.00
Total paid 536,540.54
EU participation percent 85.0%