Closure and reclamation of a municipal landfill / landfill / in PI 70175.75.21, Suvorovo land - stage construction Stage I - Technical reclamation, Gas extraction system Stage II - Biological reclamation

The project envisages closure and recultivation of a landfill with discontinued operation of landed property with identifier 70175.75.21 - landfill with an area of 1.041hec /10 410sq.m/ and partially occupied areas of the neighboring properties with a total area of 10 138sq.m in the territory of the municipality Strictly. The following activities are envisaged in the different stages of the project: Stage I - Technical reclamation of the landfill, which provides for: - arrival and compaction of the waste accumulated at the landfill in order to reduce the area intended for reclamation. - construction of drainage ditches to prevent the entry of surface (sloping) water into the body of the landfill. - Laying a layer of earth masses one meter thick, using clay materials for the lower fifty centimeter layer. Gas outlet system including vertical gas outlet wells, spaced 100 m apart, with adjacent radiation drainage layers. Stage II - Biological reclamation, including grassing and afforestation of the technically reclaimed landfill, which will take place at the post-project stage and is not included in this project proposal. The implementation of the project includes preparation activities, such as: design and copyright supervision, conformity assessment and construction supervision during the execution of the construction; - construction activities; - project organization and management activities, - information and communication activities

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 May, 2020
End date 09 Apr, 2022
Contract date 24 Apr, 2020
View in UMIS

Programme

Financial information

Total cost 796,711.32
Grant 796,711.32
Self finance 0.00
Total paid 156,240.94
EU participation percent 85.0%