The remediation of the landfill provides for technical reclamation (TR) of an area of 1 hectare within a landed property with id. 38558.14.63, located on the territory of Koprivshtitsa municipality. The following measures are envisaged under the TR: • excavation and pre-disposal of waste; • formation of the waste body; • Laying of a leveling layer 0.20 m thick until the project elevations are reached; • laying of gas drainage and gas collection system; • construction of gas wells; • Laying the sealing layer on the upper insulation screen; • Laying of the drainage system for the infiltrated through the reclamation layer of atmospheric water; • application of the reclamation layer of soil - 0.75 m (3 x 0.25 w) above the drainage system for atmospheric water; • application of a layer of humus - 0.25 w; • implementation of the surface water discharge system; • implementation of benchmarks for monitoring the depot deformation of the monitoring system; As a result of the activities carried out it will be achieved - Stability and durability of the reclaimed landfill construction under normal and special loads; - Protection against infiltration of surface waters and their removal outside the body of the landfill; - protection of atmospheric air and surface water from pollution from the landfill; - Meeting the requirements of the regulatory framework. The project proposal envisages the following activities: 1. Preparation and implementation of the project, including design, copyright and construction supervision; 2. Construction and repair works - technical rehabilitation of the landfill; 3. Project organization and management and information and communication measures.
Overview
Status | Closed (completion date) |
---|---|
Start date | 18 Jun, 2020 |
End date | 18 May, 2022 |
Contract date | 03 Jun, 2020 |
Programme
Beneficiary
Financial information
Total cost | 704,739.16 |
---|---|
Grant | 704,739.16 |
Self finance | 0.00 |
Total paid | 70,473.92 |
EU participation percent | 85.0% |
Location