NTEGRATED ARRANGEMENTS contributing to maintaining/improving the conservation status of species and habitat types in Natura 2000 aiming to reduce identified threats and implications for species and habitats within the LAG Pomorie.

The project is based on an approach and integrated measures aimed to protect and improve the conservation status of animal species and natural habitats in the following 4 PAs of the Natura 2000 within the territorial scope of the Pomorie LAG,implementing of the project activities as follows:1.BG0000151 Aytos Mountain;2.BG0000574 Aheloy-Ravda-Nessebar; 3. BG0000133 Kamchiyska and Emenska mountains;4.BG0000620 Pomorie ".Conservation measures include draining/redirecting the surface flow of rainy(sweet) waters from the salty Pom. Lake and providing video surveillance of the perimeter,which will contribute to better protection of the wetland of the lake while the range of information and protection of the species and habitats on the territory of the listed PAs on territory LAG Pomorie will be increased. The planned activities are in line with the eligible activities set out in point 13.3 of the Application Guidelines and directly address threats reflected in the analysis of target species and habitats. The project does not include the construction/reconstruction of sites that do not have a direct impact on the species/habitats. Conservation measures and video surveillance are seen as an element of maintaining specialized infrastructure that is directly related to maintaining the water regime in Pom.Lake,the target natural habitats and protected species within the PA under the LAG. The project does not include the construction of ancillary infrastructure or the acquisition of property for which the beneficiary is not entitled to build/acquire by law, as the planned measures for the conservation of species and habitats are carried out entirely on the territory of the LAG,and for public-state property is secured consent from the Regional Governor of Burgas Region.The project also includes observations of sites and species to be monitored within the NBMS,information activities,preparation of expert analyzes and studies necessary to track and measure the results achieved.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 08 Jun, 2020
End date 08 Nov, 2022
Contract date 22 May, 2020
View in UMIS

Programme

Financial information

Total cost 1,119,867.17
Grant 1,119,867.17
Self finance 0.00
Total paid 299,138.69
EU participation percent 85.0%

Location